SQA Regulated Qualifications Notification of changes to frameworks

The following table shows:

  • Finish Date has changed
  • Verification Group Changes
  • Group Award Withdrawals

This list can be sorted by clicking on the approriate column header or filtered by entering text into the filter text box.

Title Code Summary of changes Date change becomes effective for centres
SVQ 2 Community Development Work GD67 22 Extended from 31/07/2018 to 31/01/2019 11/01/2016
SVQ 3 Community Development Work GD68 23 Extended from 31/07/2018 to 31/01/2019 11/01/2016
SVQ 4 Community Development Work GD69 24 Extended from 31/07/2018 to 31/01/2019 11/01/2016
SVQ Management of Health and Safety G92E 25 Extended from 31/01/2016 to 30/06/2017 22/01/2015
SVQ 4 in Business and Administration GA3Y 24 Extended from 29/02/2016 to 31/12/2016 02/02/2016
SVQ 2 Driving Goods Vehicles: Articulated or Draw Bar GA03 22 Qualification Withdrawn 12/02/2016
SVQ 2 Driving Goods Vehicles: Motor Cycle or Pedal Cycle GA06 22 Qualification Withdrawn 12/02/2016
SVQ 2 Driving Goods Vehicles: Rigid Vehicle GA04 22 Qualification Withdrawn 12/02/2016
SVQ 2 Food and Drink Operations (Livestock Market Droving Skills) GG53 22 Qualification Withdrawn 12/02/2016
SVQ 2 Food and Drink Operations (Bakery Skills) GG56 23 Qualification Withdrawn 12/02/2016
Diploma in Community Arts Management GJ36 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
Diploma in Cultural Venue Operations GJ37 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
Diploma in Live Events and Promotions GJ38 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
Diploma in Music Business GJ39 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
Diploma in Technical Theatre Operations GJ3F 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
Diploma in Theatre Operations: Costume and Wardrobe GJ3E 46 Extended from 31/01/2016 to 31/01/2018 12/02/2016
SVQ 2 Sports Coaching: Cricket GA5F 22 Withdrawn 27/01/2016 22/02/2016
SVQ 2 Sports Coaching: Football GA6R 23 Withdrawn 27/01/2016 22/02/2016
Downstream Control Room Operations GG3A 23 Extended from 30/04/2016 to 30/04/2018 04/03/2016
Downstream Field Operations GC3E 23 Extended from 30/04/2016 to 30/04/2018 04/03/2016
SVQ 2 Leather Production GA09 22 Extended from 31/03/2018 to 31/06/2018 11/03/2016
SVQ 2 Facilities Management GA79 22 Extended from 28/02/2016 to 28/02/2020 17/03/2016
SVQ 2 Facilities Management GA7A 23 Extended from 28/02/2016 to 28/02/2022 17/03/2016
Construction Contracting Operations - Buying GC29 23 Withdrawn 02/03/2016 18/03/2016
Construction Contracting Operations - Buying GC4K 24 Withdrawn 02/03/2016 18/03/2016
Construction Contracting Operations - Planning GC2D 23 Withdrawn 02/03/2016 18/03/2016
SVQ 3 Kilt Making GA0A 23 Extended from 31/12/2020 to 31/12/2022 21/03/2016
SVQ 2 Dry Cleaning GC8P 22 Extended from 31/05/2018 to 31/08/2019 23/03/2016
SVQ 2 Laundry Operations GC8N 22 Extended from 31/05/2018 to 31/08/2019 23/03/2016
SVQ 3 Construction Site Supervision: Residential Development GC2F 23 Extended from 31/03/2020 to 31/01/2023 24/03/2016
SVQ 3 Construction Site Supervision: Residential Development GC2G 24 Extended from 31/03/2020 to 31/01/2023 24/03/2016
SVQ 4 Built Environmental Design GCAJ 24 Extended from 31/03/2020 to 31/09/2020 01/04/2016
SVQ 1 IT Users (ITQ) G9WT 21 Withdrawn 23/03/2016 04/04/2016
SVQ 1 IT Users (ITQ) G9WR 22 Withdrawn 23/03/2016 04/04/2016
SVQ 3 IT Users (ITQ) G9WP 23 Withdrawn 23/03/2016  
SVQ2 Cladding Occupations (Construction) Specialised Cladding and Rainscreen Systems GF77 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Interior Systems (Construction): Access Flooring GF79 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Interior Systems (Construction): Cavity Barrier Installation G77A 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Interior Systems (COnstruction): Interior Fixer and Sheeter G77N 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 6/04/2016
SVQ 2 Interior Suystems (Construction) Partitioning GF7P 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 6/04/2016
SVQ 3 Cladding Occupations(Construction): Roof Sheeting and Cladding GF83 23 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2020. 06/04/2016
SVQ 2 Associated Industrial ServicesOccupations (Construction): Facade Preservation GF58 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Associated Industrial Services Occupations (Construction): Passive Fire Protection GF59 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Associated Industrial Services Occupations (Construction): Water Jetting GF5A 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Fitted Interiors (Construction) GF5E 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Piling Operations (Construction): Piling Operative GF5G 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Piling Operations (Construction): Piling Rig Operator GF5H 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Concrete Occupations (Construction): Background Preparation and Profiling GF5J 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Concrete Occupations (Construction): Concrete Repair GF5L 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialised Concrete Occupations (Construction); Intu Flooring GF5M 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Installation Occupatations (Construction) Insulated Enclosures-Industrial GF65 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Installation Occupations(Construction): Dooir Systems- Installation GF63 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Installation Occupations (Construction): Door Systems - Repair GF64 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Specialist Installation Occupations (Construction): Joint Sealant Applicaton GF66 22 Qualification entered its lapsing period on 30/04/2016 and finishes on 30/04/2018. 06/04/2016
SVQ 2 Process Engineering Maintenance (Electrical) GD0D 22 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 2 Process Engineering Maintenance (Instrument and Control) GD0E 22 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 2 Process Engineering Maintenance (Mechanical) GD0F 22 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 3 Process Engineering Maintenance (Electrical) GD0G 23 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 3 Process Engineering Maintenance (Instrument and Control) GD0J 23 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 3 Process Engineering Maintenance (Mechanical) GD0H 23 Extended from 31/07/2016 to 31/07/2018 08/06/2016
SVQ 2 Finishing Furniture:Spray Finishing GA31 22 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 08/07/2016
SVQ 2 Furniture Making:Component Manufacture GA3D 22 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 08/07/2016
SVQ 2  Finishing Furniture: Hand Finishing GA3J 22 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 08/07/2016
SVQ 2 Upholstery and Soft Furnishing:Traditional Upholstery GA3F 22 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 08/07/2016
SVQ 3 Finishing Furniture GA3N 23 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 08/07/2016
SVQ 1 Beauty Therapy G9WN 21 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 19/07/2016
SVQ 2 Beauty Therapy G9XW 22 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 19/07/2016
SVQ 3 Beauty Therapy: Make-Up G9XT 23 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 19/07/2016
SVQ 3 Beauty Therapy: Massage G9XR 23 Qualification entered its lapsing period on 30/06/2016 and finishes on 30/06/2018. 19/07/2016
SVQ in Wood Occupations (Construction): Shopfitting Bench Work  GF7V 22 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2018 26/10/2016
SVQ in Wood Occupations (Construction): Shopfitting Bench Work  GF84 23 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2020 26/10/2016
SVQ in Wood Occupations (Construction): Shopfitting Site Work GF7W 22 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2018 26/10/2016
SVQ in Wood Occupations (Construction): Shopfitting Site Work  GF85 23 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2020 26/10/2016
SVQ in Accessing Operations and Rigging (Construction): Lightning Conductor Engineering  GF7X 23 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2020 26/10/2016
SVQ in Assessing Operations and Rigging (Construction): Steeplejacking GF81 23 Qualification entered its lapsing period on 30/09/2016 and finishes on 30/09/2020 26/10/2016
Business and Administration  GA3Y 24 Qualification entered its lapsing period on 31/12/2017 and finishes on 31/12/2021 15/11/2016
Community Development Work GD67 22 Extended from 31/01/2017 to 31/08/2018 28/11/2016
Community Development Work GD68 23 Extended from 31/01/2017 to 31/08/2018 28/11/2016
Community Development Work GD69 24 Extended from 31/01/2017 to 31/08/2018 28/11/2016
Performing Manufacturing Operations GE7F 21 Extended from 31/01/2017 to 31/01/2019 06/12/2016
Performing Manufacturing Operations GE7G 22 Extended from 31/01/2017 to 31/072018 06/12/2016
Performing Engineering Operations GL6E 22 Additonal Units: H2M2 04 Producing Composite Mouldings using Pre-Preg Techniques and H2M3 04 Producing Composite Mouldings using Resin Flow Infusion Techniques as been added to Group A of framework 23/12/2016

 

You can sign up to receive notification of future SVQ changes to Unit Specifications and Frameworks by following this link: MyAlerts.