Construction - Operative & Specialisms
Updates and announcements
Appendix C of the CITB SSC Consolidated Assessment Strategy has been updated 1 July 2020 to include extra-ordinary events. As a result CITB SSC have produced additional guidance for special assessment arrangements which can be used during the COVID-19 pandemic. Please see full details under the NVQ and SVQ section of the web page linked below.
Coronavirus (COVID-19) communication updates
SVQs Re-accredited 2017
Following the re-accreditation of a number of SVQs in 2017, the following link shows a comparison of old and new units. APL/credit transfer can be applied for candidates who have completed the old unit but are undertaking a new SVQ with the applicable new unit.
- Accessing Operations and Rigging (Construction): Lighting Conductor Engineering level 2
- Accessing Operations and Rigging (Construction): Lighting Conductor Engineering level 3
- Accessing Operations and Rigging (Construction): Scaffolding
- Accessing Operations and Rigging (Construction): Scaffolding and Offshore Scaffolding level 2
- Accessing Operations and Rigging (Construction): Scaffolding and Offshore Scaffolding level 3
- Accessing Operations and Rigging (Construction): Steeplejacking level 2
- Accessing Operations and Rigging (Construction): Steeplejacking level 3
- Applied Waterproof Membranes (Construction) (Built in Bituminous Roofing)
- Associated Industrial Services Occupations (Construction): Passive Fire Protection level 5
- Cladding Occupations (Construction) SCQF level 5
- Construction and Civil Engineering Operations (Construction) at SCQF level 4
- Construction and Civil Engineering Operations (Construction) SCQF level 5
- Construction Plant or Machinery Maintenance SCQF level 5
- Construction Plant or Machinery Maintenance SCQF level 6
- Controlling Lifting Operations: Slinger/Signaller (Construction) SCQF level 5
- Controlling Lifting Operations: Supervising Lifts (Construction) at Level 7
- Controlling Lifting Operations: Planning Lifts (Construction) at Level 8
- Demolition (Construction): Demolition SCQF level 5
- Demolition (Construction): Plant SCQF level 5
- Energy Efficiency Measures for Older and Traditional Buildings SCQF level 6
- Formwork (Construction) SCQF level 5
- Innovative Modern Methods of Construction (Construction): Cold Formed Steel Frame
- Interior Systems (Construction): Ceiling Fixing SCQF level 5
- Interior Systems (Construction): Dry Lining - Finishing
- Interior Systems (Construction): Dry Lining – Fixing
- Network Construction Operations (Water) SCQF level 6 - GP9V 23
- Network Construction Operations (Water) SCQF level 6 - GR71 23
- Network Construction Operations (Water) - Main Layer SCQF level 5 - GP9R 22
- Network Construction Operations (Water) - Main Layer SCQF level 5 - GR7C 22
- Network Construction Operations (Water) - Repair and Maintenance SCQF level 5 - GP9T 22
- Network Construction Operations (Water) - Repair and Maintenance SCQF level 5 - GR7D 22
- Network Construction Operations (Water) - Service Layer SCQF level 5
- Plant Operations (Construction) SCQF level 5
- Road Building and Maintenance (Construction) SCQF level 5
- Specialist Concrete Occupations (Construction): Concrete Drilling and Sawing SCQF level 5
- Steelfixing Occupations (Construction) SCQF level 5
- Thermal Insulation (Construction) SCQF level 5
- Thermal Insulation (Construction) SCQF level 6
- Waterproof Membrane Roofing Systems (Construction) Liquid Applied Membrane Roofing SCQF level 5
- Waterproof Membrane Roofing Systems (Construction) Reinforced Bitumen Membrane Roofing SCQF level 5
- Waterproof Membrane Roofing Systems (Construction) Single Ply Membrane Roofing SCQF level 5
- Winter Service (Construction) SCQF level 5
Contact Information
- Candidate Enquiries
- 0345 279 1000
- Centre Enquiries
- 0303 333 0330